DownLiveMap Speed testLive map
Pl

Pleo · 20 Nov 2026

Pleo (pleo.io) Problems – 20 Nov 2026

✓Resolved15 min

Pleo (pleo.io) had problems starting at 18:58 UTC. The incident lasted 15 min and is now resolved.

Incident details
  • SeverityProblems
  • Started20 Nov 2026, 18:58 UTC
  • Ended20 Nov 2026, 19:13 UTC
  • Duration15 min
  • Detected byOfficial status page

Visma e-conomic integration degraded performance — We’ve fixed the issue with the Visma e-conomic integration. If you're prompted to reconnect, please use that option to reauthorise to resume exporting.

Live Pleo (pleo.io) status →

Other outages at the same time
  • University of Waterloo

    git.uwaterloo.ca - application maintenance - Outage — Maintenance window extended until 11:30. --- Starting at or around 9:00 am on Friday the 20th of November, git.uwaterloo.ca and git-ist.private.uwaterloo.ca will be upgraded to latest patch in 19.6 release to address a critic…

    22:57 UTC
    6 min
  • Vendasta

    Local SEO Keyword Tracking Shows False "Not Ranked" Results Due to Google Update" — Local SEO Keyword Tracking is currently showing some keywords as “Not Ranked” even though the business is still ranking well on Google. This is caused by a recent Google search update that began …

    22:57 UTC
    6 min
  • Vanta

    Missing check results for GitHub pull requests — We have deployed a mitigation for the issue with the GitHub integration where automated check results for some GitHub pull requests were missing in Vanta. Vanta will now keep check results it has already recorded, even after GitHu…

    22:57 UTC
    6 min
  • UC Davis

    Partially Degraded Service

    22:57 UTC
    6 min
  • Lightspeed

    C-Series EMEA order visibility and updates issue — We’ve identified the cause of an issue affecting how certain C-Series orders were processed on November 18 and have taken steps to correct it. We’re actively addressing the remaining impact and working to notify affected merchan…

    22:56 UTC
    7 min
  • Lincoln Public Schools

    Synergy Assessments — This message was sent to LPS Certificated staff and Administrators 11/20/26 am: Certificated Staff: This message is intended for certificated staff who use Synergy Assessments. After reports of students encountering an Error 500 when signing into Synergy As…

    22:56 UTC
    7 min
  • Illumina Cloud Products

    AWS availability zone issues in UAE, me-central-1, affecting Illumina Connected Analytics and Basespace Sequence Hub — We are experience a full outage in the UAE due to multiple AWS Availability Zones being inaccessible due to the ongoing events in the region. We are actively mo…

    22:56 UTC
    7 min
  • Processing Foundation

    Partial System Outage

    22:56 UTC
    7 min
  • Blackbaud

    Active Issue Alert – Blackbaud Luminate Online® - #000703662 — Our engineers continue to diagnose slow performance and timeouts for a subset of customers. Please continue to check this page for updates.

    22:56 UTC
    7 min
  • Peloton

    Some members reporting that the Android mobile app is crashing at start up — A fix has been implemented and we are monitoring the results.

    22:56 UTC
    7 min
Outage history
  • Problems

    Visma e-conomic integration degraded performance — We’ve fixed the issue with the Visma e-conomic integration. If you're prompted to reconnect, please use that option to reauthorise to resume exporting.

    20 Nov 2026
    7 min
  • Problems

    Visma e-conomic integration degraded performance — We’ve fixed the issue with the Visma e-conomic integration. If you're prompted to reconnect, please use that option to reauthorise to resume exporting.

    20 Nov 2026
    28 min
  • Problems

    Visma e-conomic integration degraded performance — We’ve fixed the issue with the Visma e-conomic integration. If you're prompted to reconnect, please use that option to reauthorise to resume exporting.

    20 Nov 2026
    35 min
  • Problems

    Visma e-conomic integration degraded performance — We’ve fixed the issue with the Visma e-conomic integration. If you're prompted to reconnect, please use that option to reauthorise to resume exporting.

    20 Nov 2026
    1 h 26 min
  • Problems

    Visma e-conomic integration degraded performance — We’ve fixed the issue with the Visma e-conomic integration. If you're prompted to reconnect, please use that option to reauthorise to resume exporting.

    20 Nov 2026
    1 h 47 min
  • Problems

    Visma e-conomic integration degraded performance — We’ve fixed the issue with the Visma e-conomic integration. If you're prompted to reconnect, please use that option to reauthorise to resume exporting.

    20 Nov 2026
    12 min
  • Problems

    Visma e-conomic integration degraded performance — We’ve fixed the issue with the Visma e-conomic integration. If you're prompted to reconnect, please use that option to reauthorise to resume exporting.

    20 Nov 2026
    14 min
  • Problems

    Visma e-conomic integration degraded performance — We’ve fixed the issue with the Visma e-conomic integration. If you're prompted to reconnect, please use that option to reauthorise to resume exporting.

    20 Nov 2026
    15 min
  • Problems

    Visma e-conomic integration degraded performance — We’ve fixed the issue with the Visma e-conomic integration. If you're prompted to reconnect, please use that option to reauthorise to resume exporting.

    20 Nov 2026
    1 h 39 min
  • Problems

    Visma e-conomic integration degraded performance — We’ve fixed the issue with the Visma e-conomic integration. If you're prompted to reconnect, please use that option to reauthorise to resume exporting.

    20 Nov 2026
    20 min